Metallic SaaS Backup
5 Frameworks 4 TPRMby Commvault
SaaS backup for M365, Salesforce, and endpoints.
Pricing
Quote
Compliance
25
Controls
5
Frameworks
Pricing
Quote
Compliance
5
25 controls mapped
TPRM Resources
4
1 API 1 Trust
About Metallic SaaS Backup
TPRM Resources
4 security & compliance resources
1
API
1
Trust
2
Docs
Top Compliance Frameworks
PIC DSS
15 controls • 0 full, 0 partial
15
SOC 2
4 controls • 0 full, 0 partial
4
ISO 27001
4 controls • 0 full, 0 partial
4
COBIT
1 controls • 0 full, 0 partial
1
ITIL
1 controls • 0 full, 0 partial
1
AI-Generated Suggestions
These compliance mappings are AI-generated suggestions, not validated assessments. They indicate potential relevance between this tool and compliance controls. Always verify with a qualified compliance professional before making audit decisions.
Total Controls
25
Frameworks
5
Full Coverage
0
Avg Confidence
66%
| Control ID | Title | Coverage | Confidence | Actions |
|---|---|---|---|---|
| PCI-2475 |
Protection of Audit Trail Files (10.5.2) |
Partial | 70% | Login |
| PCI-2493 |
Name of Affected Data, System Component, or Resource is Logged (10.3.6) |
Partial | 65% | Login |
| PCI-2511 |
File-integrity Monitoring On Logs (10.5.5) |
Partial | 65% | Login |
| PCI-2528 |
Reviewing of Log Data to Identify Anomalies or Auspicious Activity (10.6) |
Partial | 70% | Login |
| PCI-2545 |
Daily Log Reviews (10.6.1) |
Partial | 65% | Login |
| PCI-2548 |
Date and Time is Logged (10.3.3) |
Partial | 70% | Login |
| PCI-2555 |
Logging Audit Trails (10.2.3) |
Partial | 70% | Login |
| PCI-2560 |
Type of Event is Logged (10.3.2) |
Partial | 65% | Login |
| PCI-2575 |
Least Privilege Access (7.1.2) |
Partial | 70% | Login |
| PCI-2616 |
User Identification is Logged (10.3.1) |
Partial | 70% | Login |
| PCI-2625 |
Limiting Access to Cardholder Data (7.1) |
Partial | 65% | Login |
| PCI-2632 |
Success or Failure Indication is Logged (10.3.4) |
Partial | 60% | Login |
| PCI-2635 |
Time Settings Are From Industry-accepted Time Sources (10.4.3) |
Partial | 65% | Login |
| PCI-2662 |
Audit Trail Files Back-up (10.5.3) |
Partial | 70% | Login |
| PCI-2677 |
Access Control System Restrictions (7.2) |
Partial | 60% | Login |
| Control ID | Title | Coverage | Confidence | Actions |
|---|---|---|---|---|
| RC-1 |
A formal risk management process is established to evaluate risks based on identified threats and specified tolerances. This process includes defining risk assessment methodologies, risk categories, and evaluation criteria. |
Partial | 70% | Login |
| RC-2 |
Risk assessments are performed at least annually during security committee management meetings and include evaluations of the following: -Organizational structure, capability, capacity, reporting lines, authorities, and responsibilities. -Environmental, regulatory, and technological changes that have occurred. -The need for additional tools and resources to achieve business objectives. -Threats and vulnerabilities affecting the achievement of commitments to clients. |
Partial | 65% | Login |
| RC-3 |
Results of the risk assessment, including identified risks and recommended actions, are communicated to the respective owners to ensure accountability for addressing risks. |
Partial | 65% | Login |
| RC-4 |
Identified risks and associated action items are documented and tracked through an ongoing risk register to monitor progress and ensure timely resolution. |
Partial | 60% | Login |
| Control ID | Title | Coverage | Confidence | Actions |
|---|---|---|---|---|
| 7.1 |
7.10 Storage media - Storage media shall be managed through their life cycle of acquisition, use, transportation, and disposal in accordance with the organization's classification scheme and handling requirements. |
Partial | 70% | Login |
| 7.4 |
7.4 Physical security monitoring - Premises shall be continuously monitored for unauthorized physical access. |
Partial | 65% | Login |
| 7.5 |
7.5 Protecting against physical and environmental threats - Protection against physical and environmental threats, such as natural disasters and other intentional or unintentional physical threats to infrastructure shall be designed and implemented. |
Partial | 60% | Login |
| 7.9 |
7.9 Security of assets off premises - Off-site assets shall be protected. |
Partial | 60% | Login |
| Control ID | Title | Coverage | Confidence | Actions |
|---|---|---|---|---|
| 41 |
Facilitates international collaboration on ICT matters. |
Partial | 70% | Login |
| Control ID | Title | Coverage | Confidence | Actions |
|---|---|---|---|---|
| ITIL-3760 |
What measures are in place to mitigate the risk of losing key clients or accounts? (Client Loss) |
Partial | 70% | Login |
4
Total
1
API Docs
1
Trust Center
API Documentation
1 resourceTrust Center & Security
1 resourceSecurity & Compliance – Metallic
https://metallic.io/security-compliance#:~:text=Securely%20back%20up%20critical%...Documentation
2 resourcesQuick Access
No reviews yet
Be the first to review Metallic SaaS Backup.